Page 12 - E-brochure - Embassy Techzones
P. 12
IT PARK @ INDJIJA, SERBIA
Mechanical:
1. Fire protection - Sprinkler system for of ces & Inergen re suppression system for server rooms.
2. HVAC - VRF system for cooling and heating & radiators for heating for of ces and VRF cooling system for server rooms
Electrical:
1. Lighting with PHILIPS luminaries will be xed to the ceiling to ful ll LEED requirements.
2. Two oor boxes with sockets ( power supply sockets, UPS supply sockets and net work sockets) will be supplied for every 20m2 of of ce space.
3. The off ice will be supplied with cables for lighting, sockets and oor boxes and cable trays in the raised oor.
4. UPS: As per current design, tenant can bring in 3 x 40 kVA -two for server rooms and one for the of ce. UPS related infrastructure consisting of cables
and circuit breakers in the electrical panels will be supplied by us. The tenant shall inform us in advance if any additional capacity / equipment is required.
Telecommunication:
1. Fire detection system with detectors in the suspended ceiling will besupplied.
2. Cable trays for telecommunication will be in the raised oor
3. We will supply four rack panels in the server room with passive equipment
Architectural:
1. Raised oor with electrostatic carpet cover
2. 60 x 60 Suspended modular panel ceiling
3. Painted gypsum board perimeter walls
4. Painted and plastered structural columns
Notes: Partition walls, doors or any other partitions in the of ce space can be supplied at extra cost along with additional cabling and other speci c requirements.
Embassy group
Mechanical:
1. Fire protection - Sprinkler system for of ces & Inergen re suppression system for server rooms.
2. HVAC - VRF system for cooling and heating & radiators for heating for of ces and VRF cooling system for server rooms
Electrical:
1. Lighting with PHILIPS luminaries will be xed to the ceiling to ful ll LEED requirements.
2. Two oor boxes with sockets ( power supply sockets, UPS supply sockets and net work sockets) will be supplied for every 20m2 of of ce space.
3. The off ice will be supplied with cables for lighting, sockets and oor boxes and cable trays in the raised oor.
4. UPS: As per current design, tenant can bring in 3 x 40 kVA -two for server rooms and one for the of ce. UPS related infrastructure consisting of cables
and circuit breakers in the electrical panels will be supplied by us. The tenant shall inform us in advance if any additional capacity / equipment is required.
Telecommunication:
1. Fire detection system with detectors in the suspended ceiling will besupplied.
2. Cable trays for telecommunication will be in the raised oor
3. We will supply four rack panels in the server room with passive equipment
Architectural:
1. Raised oor with electrostatic carpet cover
2. 60 x 60 Suspended modular panel ceiling
3. Painted gypsum board perimeter walls
4. Painted and plastered structural columns
Notes: Partition walls, doors or any other partitions in the of ce space can be supplied at extra cost along with additional cabling and other speci c requirements.
Embassy group